Floating power plants

BMES

Blue Mobile Energy Sources: electricity from the water.

A BMES power barge is a complete power plant on a pontoon. It is towed to your coast, moored and connected to your grid. 30 to 100 MW per barge, in months instead of years, without existing power infrastructure.

The numbers

What a BMES power barge delivers

Design values of our barge types. Every barge is planned for its site and confirmed in the offer.

30 to 100 MW

electrical power per barge

300 GWh

electricity per year from one 40 MW barge

6 to 9 months

from order to delivery

10 working days

from site visit to your proposals

No grid infrastructure needed

The barge feeds electricity from the waterside. Only a connection point on shore is required.

Flexible fuel

Diesel, HFO, VLSFO or LNG. You supply the fuel by land or sea, or we organise it.

Guaranteed energy

The amount of electricity is fixed in a power purchase agreement and delivered by our own crew.

Is it right for you?

Who it is for and what you need

Made for

Islands and coastal towns that are undersupplied or depend on a single, weak connection.

Ports and harbours that are being built or extended and need more power than the local grid delivers.

Land-based power plants that need a bridge while they are built, repaired or extended.

Regions after a disaster where electricity is needed fast and the grid is damaged.

What you need

A mooring site. Water with enough depth for the pontoon. We check tides and extreme weather on site.

A grid connection point. The interface between barge and local grid is defined in the pre-study.

A fuel route. Fuel supply by land or sea, by you or organised by us.

Permits. An environmental impact assessment for the location. We carry it out for you.

Your demand. Power, amount of electricity per year and how long you need it.

Two ways to work with us

Buy the electricity or buy the barge

You decide how much you want to own. In both cases we plan, build, deliver and commission the barge.

Power purchase agreement

You buy electricity.

We build, own and operate the barge.

Guaranteed amount.

Up to 300 GWh per year from one 40 MW barge, fixed in the agreement.

Our crew on board.

Project managers, naval architects, superintendents and mechanical and electrical staff.

Purchase of the barge

You own the barge.

We deliver it ready for operation.

Complete scope.

Engineering, assembly, testing, transport, connection and commissioning.

Training.

Your operators are trained during commissioning.

12 months warranty

after commissioning on site.

The barges

Three sizes, one principle

All barges are non-self-propelled pontoons with proven medium-speed engines. Waste heat can be used in a steam turbine or ORC unit to raise efficiency.

Barge typePowerEnginesGridFuelElectricity per year
Power Barge 01up to 30 MW4 diesel engines50 HzHFO or dieselup to 225 GWh
Power Barge 02up to 40 MW4 dual-fuel engines60 HzHFO, diesel or LNGup to 300 GWh
Large bargeup to 100 MW6 medium-speed gensets50 HzMDO, MGO or VLSFOby agreement

Electricity per year at about 7,500 running hours. The large barge is planned in our current project.

Power Barge 01, 30 MW: about 225 GWh per year at 7,500 running hours.

Power Barge 02, 40 MW: about 300 GWh per year at 7,500 running hours.

On board

Proven engines, quick to build

Our barges use proven 4-stroke medium-speed engines. Where it makes sense, we use well-maintained engines and pontoons from existing plants and give them a second life. That saves time and cost. Every engine and pontoon is inspected before it is used, and fuel consumption is measured at 100, 85, 75, 50 and 25 % load during commissioning.

Medium-speed engine

Proven 4-stroke medium-speed engine.

Current project

100 MW for the Indian Ocean

We are building a 100 MW diesel power barge that will be delivered to and operated in the Indian Ocean. Six medium-speed gensets on a pontoon of about 100 by 30 metres, planned launch in 2027. A dedicated project team in Augsburg coordinates the international work.

100 MW

guaranteed power

6

medium-speed gensets

100 × 30 m

pontoon

2027

planned launch

How we work

From pre-study to running power

1 · Pre-study

AES Engineering & Consulting visits your site: tides, weather, grid interface. You get a report and up to three technical and commercial proposals within 10 working days.

2 · Permits

An environmental impact assessment confirms the location and operation.

3 · Engineering

Naval engineering, inspection of engines, gensets and pontoon.

4 · Build

Assembly, testing and commissioning of the barge at the shipyard.

5 · Transport

The barge is towed or carried by heavy-lift ship to your coast.

6 · Connect and operate

Connection and commissioning on site, operator training and operation manual.

If you order a barge, the cost of the pre-study is credited to the purchase price.

Today and tomorrow

From grey to green power

Today. Reliable engines running on diesel, HFO, VLSFO or LNG, the fuels available at your site.

Tomorrow. Barges with hydrogen or synthetic fuels, and new technologies such as fuel cells, for green electricity when you need or require it.

BMES barge types: fossil fuels deliver grey power, hydrogen, synthetic fuels and fuel cells deliver green power.

Questions we hear

Your questions, answered

Do we need existing infrastructure?

No. The barge supplies power from the waterside. In the pre-study we agree where the power is fed into your grid.

How fast can we have power?

Each barge is planned for your project. From order to delivery it takes about six to nine months, depending on size and permits.

Who operates the barge?

With a power purchase agreement our own crew runs it. If you buy the barge, we train your operators.

Who supplies the fuel?

You can supply it by land or sea, or we organise it for you.

Which grid frequency is possible?

50 Hz or 60 Hz, depending on your grid.

What does the pre-study cost?

We make you a fixed offer for the site visit. If you order a barge, the cost is credited to the purchase price.

Contact

Tell us about your electrical needs

Send us the location, the power you need and your timeline. We check how we can supply you and suggest the next step.

All data on this page is non-binding. Every site is different, figures are design values and are confirmed for each project.

Also interesting for you:

Join the project

Build a power barge with us

For our 100 MW power barge we are currently building a project team in Augsburg: project leader, mechanical and electrical engineers, planner and administrative assistant.